Completed
BEFORE: Just a small example of the extensive rotten framing throughout the entire house
AFTER: A fresh, clean new look with cement board siding that will last a lifetime
BEFORE: A broken sump pump led to the flooding of this basement. The bamboo plank floor had to be removed along with partial replacement of drywall
Finished product
Customer wanted a pergola for guests to enjoy in the vineyard. Stone patio was installed underneath and the grape vines eventually grew around the posts for the perfect place to enjoy a glass of vino
Finished product
The damage caused by a car hitting the building
BEFORE: A leak discovered under the jacuzzi tub resulted in a full gut of this bathroom.
Finished product.
The original building as the main station for the Shepaug Railroad (operational from the late 1800's to early 1940s.
.png/:/cr=t:18.59%25,l:0%25,w:100%25,h:48.09%25/rs=w:515,h:234,cg:true)
Thank you for reaching out! We are currently booked thru September 2025! Please tell us about your Fall and Winter Projects!
We look forward to working with you!